02 / MODULAR

A certified dwelling, built in a factory and craned onto your site.

Class 1A certified homes, fixed spec and fixed price. One delivery, not a year of trades on your site.

Certification
Class 1A
Contract to keys
~16 weeks
Display home
Bonogin, Gold Coast. Book a visit
02 / COMPARISON

Modular versus traditional.

The work moves off site and into the factory.

FactorTraditional buildArc Modular
Where it's builtOn site, exposed to weatherIn a factory, weathertight from day one
Pricing certaintyVariable, trade-dependentFixed price, published inclusions
Site timeMonths of trades on siteA single delivery and install event
Programme riskWeather and trade availabilityFactory schedule, contract to keys ~16 weeks
03 / INCLUSIONS

What's included.

What every Arc Modular home comes with.

Exterior

  • + V-Groove Deco cladding
  • + Lysaght Enseam wall and roof cladding
  • + Aluminium-framed windows
  • + Colorbond roofing

Interior

  • + Oak hybrid flooring
  • + Travertine surfaces
  • + Oak veneer joinery
  • + ABI brushed brass hardware
  • + SMEG appliances
04 / PROCESS

Six steps, contract to keys.

Roughly 16 weeks from signed contract to handover.

  1. Design & documentation

    Concept confirmed and documentation finalised, carried over from Arc Studio if applicable.

  2. Contract

    Build contract signed.

  3. Factory manufacture

    The dwelling is fabricated, fitted out and finished in the factory.

  4. Site preparation

    Footings and services prepared to receive the module.

  5. Delivery & install

    The module is transported and craned into position in a single coordinated event.

  6. Handover

    Final connections, inspection and keys.

05 / BUILD SEQUENCE

Built inside, delivered whole.

It leaves the factory finished and goes straight onto its footings.

Isometric line drawing of two factory-finished Arc modules being delivered and set on piers Piers are cast on both pads, a factory-finished module -- walls, roof, glazing and door already complete -- arrives on a low-loader and is lifted by mobile crane onto its piers, a second module follows the same sequence mirrored, and a breezeway is built on site to link them, finishing with the completed building.
Isometric, delivery sequence · schematic riggingLine-work, not to scale on screen

01 / 07

Footings and piers

Both pads are marked out and the piers are cast, ready to take a module straight off the truck.

Step 1 of 7

Each module arrives finished. Only the breezeway is built on site.

One Arc module at dusk: dark vertical cladding, a timber-lined gable end fully glazed to the apex, and a covered porch on a concrete step.
Finished module, full elevation.
Dark vertical cladding on a module's long wall at dusk, with a glazed door showing the bedroom lit inside.
Cladding and glazing detail, dusk.
06 / SITE & INSTALLATION

What you arrange. What Arc manages.

You arrange

Site responsibilities

  • 01 Site access for delivery vehicles
  • 02 Utility connection points
  • 03 Council approval process, typically 6-12 weeks
  • 04 Any local permit or neighbour requirements
Arc manages

Delivery responsibilities

  • 01 Factory manufacture and finishing
  • 02 Transport, OSOM permits and pilot vehicles
  • 03 Crane placement on delivery day
  • 04 Final connections and handover
07 / LOGISTICS

How a module actually gets to site.

One oversize load, factory to site.

Finished height
~4.6 m
Width
Up to 4.5 m
Length
12.5–15 m
Weight
25,000–35,000 kg
Transport
Prime mover + low-loader
Delivery window
Daylight, 7–10am weekdays
  1. Design & approval

    Confirmed before manufacture begins.

  2. Factory manufacture

    ~12 weeks.

  3. Delivery scheduling

    Confirmed roughly 4 weeks prior.

  4. Install brief issued

    2 weeks prior to delivery.

  5. Delivery & install day

    Module arrives and is craned into position.

It travels under an oversize permit with a pilot vehicle. Arc and the transport operator manage the permit and the route for you.

Figures from the Arc Logistics Guide.

08 / PRICING

Price your own layout.

Pick a module, set the size, add a second wing. You see the price of the layout you draw, and the inside is tailored in design.

Complete and kit prices for every layout. GST included, logistics excluded.

Build your own Or send an enquiry and we'll call you
09 / QUESTIONS

Modular questions.

Can I get a mortgage on a modular dwelling?

Yes, Class 1A certification means an Arc Modular dwelling is treated the same as a traditional build by most lenders.

How long does council approval take?

Typically 6-12 weeks, depending on council and site conditions.

Can I customise the design?

Custom briefs go through Arc Studio first, then roll into the Modular build contract.

What's the total timeline from contract to keys?

Around 16 weeks, covering factory manufacture, delivery scheduling and install.

Is there a warranty?

Yes, covering the dwelling as a certified build. Ask on your call for the specific terms that apply to your contract.

Ready to talk through your site?

Price a delivered home